Posts
Crane Accident – Contact with 11KV power line – Design your laydown Area
Crane, Electrical Safety, electricity, Risk AssessmentIntroductionThe crane contractor was requested to come to the Queensland construction site to dismantle and transport their 4600 and 4100 Manitowoc cranes offsite.Three personnel came to site – A leading hand, crane driver and…
Another Crane “Dropped Load Incident” – Lifting Flexible loads
Dropped LoadFlexible Load & Over Centre Scissor Clamps
A Dangerous Combination
Back at the beginning of my safety career, I investigated a dropped load incident where a 25 metre length of rail line fell whilst the rail was being lifted…