Crane Accident – Contact with 11KV power line – Design your laydown Area

, , ,
IntroductionThe crane contractor was requested to come to the Queensland construction site to dismantle and transport  their 4600 and 4100 Manitowoc cranes offsite.Three personnel came to site – A leading hand, crane driver and…

Another Crane “Dropped Load Incident” – Lifting Flexible loads 

Flexible Load & Over Centre Scissor Clamps A Dangerous Combination  Back at the beginning of my safety career,  I investigated a dropped load incident where a 25 metre length of rail line fell whilst the rail was being lifted…